Reader.pngAn ETO project P31P001 can be interfaced to Job Cost accounting and a Job Cost Chart of Account Structure, Job, Cost Type, Cost Code. The Project Attributes P31P011 header record, Project Information tab, provides the charge to Business unit. The Job Cost tab provides the Subsidiary (Cost Code) and the Project GL class code for the cost Type (object) lookup. The Upload Job Cost Budgets (R31P800) program is used to move amounts from the ETO project to the Job. This new KM document explains the process. (Doc ID 2390084.1). http://ora.cl/4E2Ja