To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Narrative Reporting
Discussion List
-
Comparing data between ERP and Planning in a ReportSummary: Hi All, Since you can reference cells in another grid I thought it was possible to use 2 different data sources with different structures like Planning and ERP,… -
Reference Variable to drive the POV on a Management ReportSummary: Can a Reference Variable be used as a Variable to drive the POV on a Management Report? Content (required): I would like to have a repository of Variables that … -
What's the best way to migrate report packages and reports to another environment?Summary: I've migrated reports and report packages to another environment but can't seem to refresh them despite repointing the reports to the new data source. Have I mi… -
NR: Excel Table reference doclet's Format not respected in wordSummary: Content (required): hi all We are experiencing the following: tables embedded in word are not maintaining column width formatting. We have an Excel reference do… -
Can you suppress a grid dependent on another suppressed grid within the same report?Summary: Hi, is is possible to suppress a grid based on suppression of another grid within the same report and the same sheet? Content (required): Version (include the v… -
Copy and Pasting data from an NR Data Source Using Smartivew, "Planning Provider Error"Summary: Content (required): I am trying to use the SmartView copy and paste functionality to copy data from an excel ad hoc grid into a Word Doclet. I followed all of t… -
What’s New in EPM Cloud Narrative Reporting and Reports Release 22.11What’s New in EPM Cloud Narrative Reporting and Reports Release 22.11 Please refer to the November 2022 What's New Guide to understand the new features included in EPM C… -
Narrative Reporting trainingSummary: Does anybody know how to access the Narrative Reporting training? Or at least to see the contents of the course? I found this page: Narrative Reporting Training… -
Issue with Cell Value function - Cannot refer the values from dynamic rows in other gridSummary: Not able to refer to the values in the dynamic rows from other grid, please review the attachment and confirm, if there is another way to address this requireme… -
Server-side refresh not working on ERP connectionsSummary: Content (required): We have the excel reference doclets with connections to Oracle FCCS and Oracle Cloud ERP. We are able to make the server-side refresh for th… -
"Unable to complete requested action because the rpt package does not contain any rpt content" ErrorSummary: I am getting this error when trying to preview a report package: "Unable to complete requested action because the report package does not contain any report con… -
Refresh Excel SmartView POV members directly from Report PackageSummary: Hi there, I am wanting to know if it's possible to update reference document (Excel SmartView) members across multiple Excel reference docs directly from one ce… -
Can't refresh reference doclets with migrated report packSummary: I've migrated reports and report packs from one environment to another and everything looks fine except I'm not able to refresh the reference doclets that the r… -
Is there a way to link Static/Reference variable used in the content of doclet to the subvar in MR?Summary: I am supposed to create 5 report packages and may have to maintain CurrYr/CurrMnth and CurrDate as Static variables to manage the content references in the docl… -
Is it possible to pick multiple selections (that add up) in the POV of reports?Summary: Is it possible to pick multiple selections (that add up) in the POV of reports? This would be similar to how it behaves in Pivotables in Excel as per the screen… -
MemberAlias formula in Graph Titles?Summary: Can the MemberAlias formula be used for Graph titles? Content (required): Our organization wants to use the graphing engine in our EPM Platform Reports - is the… -
Is it possible to see additional version history for doclet(s) exceeding 20 revision rounds?Summary: There are a few doclet(s) that go through quite extensive editing rounds resulting in more than 20 versions of a doclet being recorded. When looking at the vers… -
Repeated Headings for selected dimensions?Summary: Content (required): Repeat Headings is a global setting, so it affects all dimensions in the row. Is there a way to have the headers repeat for just one of my r… -
Row Banding - Can we have white-gray row banding instead of gray-white row bandingSummary: We applied the row banding to the row, but we wanted it white-gray banding instead of gray-white banding. Can anyone guide me through this, or have a work aroun… -
Automated ID Field in Narrative ReportSummary: Automated ID Field in Narrative Report Content (required): Is there a way to generate an automatic, auto-incremented ID field in the very first column of a Narr… -
Report with traffic lights issueThe following applies to Reporting in Planning, but maybe it also applies to Narrative. I have created a report with traffic light symbols, using conditional formatting.… -
System administrator workflow notificationsSummary: I can't seem to set the system admin to receive notifications when a report pack has been fully submitted so it can be progressed to the next stage. Content (re… -
Official name of Reports in Narrative Reporting?Summary: Looking for the official name of the Reports in Narrative Reporting Content (required): Hello Team, I have been looking for the official name of the Reports in … -
How can I return a negative value when using the "difference" formulaSummary: I am trying to prepare an income statement. In the current year expenses are greater than revenues. The formula I am using is "round(difference(row[21], row[9])…User_2025-02-11-09-50-09-390 31 views 4 comments 0 points Most recent by User_2025-02-11-09-50-09-390 -
EXCEPT function in Narrative Report no workingSummary: Use of Except function in a narrative report not functioning as expected Content (required): I have an account SDUKS_SC that I wish to pull in a narrative repor… -
Specific POV OrderSummary: The dimensions need to appear in a specific order in POV. Although the dimensions are aligned as requested by the client, the order is not followed in the repor… -
How to synchronized automatically PBCS Reports Changes with Narrative Reporting LibrarySummary: How to synchronize automatically the PBCS Reports Changes with Narrative Reporting Library - same reports Content (required): We are looking for a solution to s… -
Dynamic/Relative VariablesSummary: Is there a capability that exists that enables the creation of date variables that can be substituted in place of various date formats? Content (required): I am… -
Member Function - Application DomainSummary: Is there is a member function (much like the "Report Location" function) that would enable the report output to display the domain for the application? Content … -
What’s New in EPM Cloud Narrative Reporting and Reports Release 22.09What’s New in EPM Cloud Narrative Reporting and Reports Release 22.09 Please refer to the September 2022 What's New Guide to understand the new features included in EPM …