To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Maintenance
Maintenance
Discussion List
-
Is it possible to inherit the meters readings from the parent asset to the child asset?Summary:Is it possible to inherit the meters readings from the parent asset to the child asset? Content (please ensure you mask any confidential information): Customer w… -
If a sparepart of inventory was used in maintenance, is possible to order another one automatically?Summary: If a spare part of inventory was used in maintenance, is it possible to order another one automatically? 23D (11.13.23.10.0) Code Snippet (add any code snippets… -
Generate a work order because a meter is outside the established parameters automatically?Summary: Is it possible to Generate a work order because a meter is outside the established parameters automatically? Content (please ensure you mask any confidential in… -
How can we create Invoice for Maintenance work OrdersSummary: Hi Team, We have a business requirement of creating invoices to the Maintenance work order, where the Maintenance of Asset is completed at Company-A and Company… -
Import Installed Base Assets end with following error - ORA-01436: CONNECT BY loop in user dataWe are trying to Import Maintenance Assets through FBDI. The Load Interface ESS gets Succeeded. However, the Import Installed Base Assets end with following error - ORA-… -
meter readings not coming when I use endpoint /fscmRestApi/resources/11.13.18.05/meterReadingsI am expecting lot of meter readings, but only getting 10 end point /fscmRestApi/resources/11.13.18.05/meterReadings -
Request to close the access of reopen work orders.Hi Team, We have a requirement, that we need to restrict the user for reopening of closed Maintenance work orders. Only those users who have been assigned a role or have… -
Duplication of spare parts needs warning from the system in work orderHi Team We have a requirement that,in response to a request from users, the system should be notified if the same spare part or operation is repeated or duplicated for t… -
Need to create multiple work definition in one work orderHi Team We have a requirement that, is their any feasibility of adding multiple work definitions to the Maintenance work order. Example: For one Work order requires two … -
24A Maintenance Program FBDI Updated Version availabilitySummary: Maintenance 24A Release Notes MANAGE MAINTENANCE PROGRAMS ACROSS ORGANIZATIONS USING FILE-BASED DATA IMPORT AND REST API Content (please ensure you mask any con… -
Need to change the Start Date to adjust the Work Order generation for next intervals in a PMSummary: Need to change the Start Date to adjust the Work Order generation for next intervals in a Work Requirement. We tried to change the start date of a base interval… -
Unable to find the change details been made on the maintenance meter templateHello Everyone, In line with the raised question, we need to have the information on change been made on the various meter template, which we dont have it on either on t… -
Not able to default the flags on Maintenance Program - Work Requirement tabSummary: Not able to default the flags on Maintenance Program - Work Requirement tab Content (please ensure you mask any confidential information): Need to default the v… -
There is no priority guidelines or SLA while creating the Work Order and how can we achieve thisSummary While creating the work order we have priority is there any guide lines (or) SLA that system will trigger for Maintenance work order. Content (please ensure you … -
How to load high volume customer asset with FBDISummary: We have a requirement of load 10 million + customer asset records to be loaded from EBS to Cloud. Do anyone have any idea of loading such a huge volume of data … -
How to make Priority field mandatory from pop-upSummary: When creating maintenance work order manually, how do we set the Priority field mandatory from the pop-up window (when you click plus sign, before Save and Edit… -
Can I reactivate an end dated enterprise asset?Summary: A customer has mistakenly end dated an asset and wants to reactivate it. Content (please ensure you mask any confidential information): Version (include the ver… -
can we assign multiple values for grouping attribute in asset group rulesSummary: I have a requirement to group asset using asset group feature in maintenance cloud. But we need to assign multiple values for single grouping attribute, so that… -
Where do we see Asset Charges in UISummary: We are in process of creating Customer Asset in our environment through FBDI along with Asset Charges. Where do we see these asset charges in UI? Content (pleas… -
Meter Reading validationSummary: We have a scenario where technician should not enter more than certain reading points in Asset meter readings page (meter Type: Continous meter), Please let us … -
EBS is generating the forecast in weekend as well but the calendar been set as 5 day workingHello Everyone, In EBS (R12) the EAM is forecasting the work orders in weekend as well however, the calendar is of 5 days been set up, so is there any additional configu… -
What table columns from Quality management can be used to join Maintenance table in oracle fusion?Summary: We have a requirement to build a custom BIP report Content (please ensure you mask any confidential information): what column from Quality management table of Q… -
Multilevel Maintenance WO approvalSummary: can we have multilevel Work order approval in Cloud Maintenance business Requirement: Electrical Engineer create the Maintenance Work order, which requires dept… -
Maintenance Forecast for the Day Interval is forecasting and creating WO on the weeknedsSummary: Hello All, We are having one small issue where the Maintenance Program and Work Requirement as per the Day interval the system is generating the forecast and cr… -
Unable to choose the fields on PRJ_PROJECT_MANAGER_V from New Value set TableSummary: Business Requirement is to Bring Project manager details in Work Order Maintenance screen under Project Details section Content (please ensure you mask any conf… -
Print Maintenance Work Order Material List ParametersSummary: We want the Work Order To and Work Order From Field to be Mandatory or have the same value if Work Order From is left blank. Is there a way to do this? Content … -
Work Order Attachment Rest APISummary: We are trying to call work order attachment rest api to get and post attachment but getting 404 error. Content (please ensure you mask any confidential informat… -
BPM for MaintenanceSummary: Can anyone please explain how to configure the multiple approval steps using BPM in Maintenance Content (please ensure you mask any confidential information): V… -
Why am I unable to add materials (stocked inventory) to an existing work order using FBDI?Summary: I am trying to add materials to existing work orders in bulk using FBDI. When I run the process, it says it succeeded but no materials were added to the work or… -
Which rest or soap api we can use to get the asset imageSummary: We are looking for rest or soap api which we can use to fetch the image which is attached to asset Content (please ensure you mask any confidential information)…