To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Maintenance
Maintenance
Discussion List
-
Is it possible to load via FBDI or other means for Asset Failure Sets?Is it possible to load via FBDI or other means for Asset Failure Sets? -
Is it possible to Add Sub Operations and Sub Resource to Work OrdersSummary: Client are requesting if it is possible to add a sub operations and sub Resources to the different operations in a work order Content (required): Client are req… -
Is it possible to review Maintenance Costs at the Parent Asset Level?Summary: I have a virtual Parent Asset called Line 1, beneath that I have 4 different maintainable assets. Looking for the ability to review maintenance costs at the vir… -
Unable to add or configured the day-light saving timings in the Maintenance calendar in fusionSummary: Our client works in the APAC region where there is default day-light saving is been there throughout the year now there is no such option where we can configure… -
How to disable On Hold status work order option in system?Summary: Hello Team, The users are keeping their work orders On Hold unnecessarily. Here, On hold status is located in two screens. Main Screen (Mass action) Specific wo… -
Unable to Update Install Base Asset DFF using VBCS in ExcelSummary: Hi All, I am trying to use VBCS excel plugin to bulk update 'Install Base Asset ' Attributes but I am getting an error when I try to update DFF. Getting the bel… -
Manage Failure SetsGood afternoon! I'm studying the Failure Sets functionality in the demo environment. I can configure the environment, codes smoothly. However, I am running into some pro…Raul Cesar Bezerra Vasconcelos 111 views 11 comments 0 points Most recent by Prasanth Senthivel-Oracle -
How to inactivate an Item in Product ManagementSummary: How to inactivate an Item in Product Management Content (required): How to inactivate an Item in Product Management. We need to inactivate Item/Product so that … -
Need Reports and Analytics link to the Maintenance Management that allows quick access to reportSummary: We need to create a shortcut in the maintenance module that allows quick access to maintenance reports. We have the same for PIM module as well as Inventory Mod… -
Can the Work Order History tab reflect any other changes done on the Work orderSummary: Client is requesting if it is possible for the Work Order history tab to reflect any changes made on the Work Order aside just reflecting only changed status. e… -
Add customised "Repair transaction code" during maintenance WO executionSummary: In fusion, how to add customised "Repair transaction code" LOV's during maintenance WO execution.Shyam Ganesh Parthasarathi-Oracle 111 views 2 comments 0 points Most recent by Shyam Ganesh Parthasarathi-Oracle -
How to restrict reopening of closed status work order option in system?Summary: Hello Team, The users are reopening their closed work orders and changing their status to unreleased or released status and issuing materials against the existi… -
How can I define that number of child assets using a BOM explosion method will be as item numberSummary: The system automatically generates a number that starts with 10000000 Is it possible to define that a logical asset number will be the same as an item number? A… -
Default Project and Task on Project Driven Maintenance Work Order creationSummary: We are using the Project Driven and we need to default the Project and Task based on the Asset whenever a new Work Order is created Content (required): We are u… -
How to add search criteria based on DFF ?Summary:How to add search criteria based on DFF ? Content (required): Version (include the version you are using, if applicable): Code Snippet (add any code snippets tha… -
Hi, How to create asset hierarchy for Installed base assets using FBDI without exploding BOM?Summary: Need to create asset hierarchy without "Use BOM as initial hierarchy Flag" using FBDI Content (required): We need to migrate legacy data wherein we can link chi… -
Is It Possible To Add A Row Count On Maintenance Work OrdersSummary: Just wondering if it is possible to add a row count on the Maintenance Work Order screen? Content (required): Just wondering if it is possible to add a row coun… -
How to trim leading and trailing spaces in a text fieldSummary: How to trim leading and trailing spaces in a text field Content (required): The use case is to trim leading spaces in "Asset Number" field. When the user enters… -
work order project-driven picking from project without taskSummary: Hello, We have enabled project-driven and we want to use project on work orders. on the work order and on the purchase order we need to specify the project and … -
OTL and project-driven maintenance work ordersSummary: Hi, We are looking to push the information related to the time taken by the resource (labor) against the project -driven work order from Oracle Maintenance Clou… -
Can we create customer based PM programs rather than Asset/Item.Summary: Hi All, We have requirement wherein PM programs needs to be created based on Customers rather than Asset/Item . We may have many items which one customer has bo… -
api name for Last Sales Order Details object under Install Base Asset (CseAsset)Summary: Need to access "Install Date" field from Last Sales Order Details sub tab via groovy and looking for api name of this object - Last Sales Order Details. Content… -
Record Meters at Work Order Completion does not have Optional as a valueSummary: Need to set up the Meter template "Record Meters at Work Order Completion" = Optional Content (required): Documementaion for Maintenace "Define a New Meter Temp… -
unable to consider the substitute items in the maintenance work order Printable View UpdateSummary: Hello, In line with the subject line, we are facing a issue where we have provided the substitute items in the Product Information management agains the spares/… -
Transaction Note column not showing values for the OTBI ReportSummary: Hi Team, We are not able to see values in the Transaction Note column for the OTBI Report. We have merge two subject area as below for business requirement and … -
How to enter Asset Group Number at Sales Order LineSummary: How to update Asset Group Number at Sales Order Line Content (required): Maintenance Management guide specifies under Asset Group Rules as below. https://docs.o… -
How are the Resources Sorted when selecting on a WO operation?Summary: Hi Experts, Just wanted to understand how are the resources Sorted in the picker when trying to assign resource to an operation? Every user see the list sorted … -
How to restrict users only to charge the item not reverse in Report Resource TransactionsSummary: We want to allow certain user to do only charge the item and we don't want them to reverse the item. As i checked, the previlege Report Maintenance Material Tra… -
Equivalent Oracle Cloud table/view for the EBS 11i entity QA_CSI_ITEM_INSTANCESSummary: Could you please help us to provide the equivalent Oracle Cloud table/view for the EBS 11i entity QA_CSI_ITEM_INSTANCES? Content (required): Version (include th… -
Equivalent Oracle Cloud table/view for the EBS 11i entity CSI_ITEM_INSTANCES_HSummary: Could you please help us to provide the equivalent Oracle Cloud table/view for the EBS 11i entity CSI_ITEM_INSTANCES_H? Content (required): Version (include the…