To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Manufacturing
Manufacturing
Discussion List
-
Work order material reservation from material availability screenSummary: Can we create a reservation against the work order from the Material Availability screen after running the Check Material Availability process, with or without … -
How to record/report technician labor hours on the work orders for multiple technicians workingSummary: How to record/report technician labor hours on the work orders for multiple technicians working on one operation sequence against the same resource. Also, with … -
Do work order created manually shows the impact of resource utilization and efficiency defined ?Summary: Is there any impact on work order created manually with default scheduling setting for adding the resources having utilization and efficiency less than 100% to … -
Item Structure Changes to Work Definition Are Not VisibleWhen I updated the Item Structure to replace the A item and added a supersession on items B & C with effectivities dates…. Then,I ran the process but the work definition… -
Substitute on item structure, but does not show in work definitionSummary: Substitutes have been created for the item structure. The substitutes are not showing in the work definition. Content (please ensure you mask any confidential i… -
Is there any WO reverse workflow in FusionWe have requirement to Reverse the WO: Below is the detailed scenario: WO Standard Flow: Unreleased > Released > Pick Material > Reserve > Complete Operations > Backflus… -
Outside Processing – Can Requisition Lines Be Split or Have Different Need-by Dates?Hi everyone, We’re currently working with Outside Processing (OSP) in Oracle Fusion Manufacturing and Procurement, and we’d like to clarify a specific point regarding re… -
Disable Work Order Subtype Lookup valuesHello, We would like to use the Work Order Subtype attribute within Work Orders and create new subtype values. At the same time, we would like to disable or inactivate t… -
How does Oracle connect Operation 10 output with OSP Item in OSP flow?Hello everyone, We are currently implementing an Outside Processing (OSP) flow in Oracle Fusion Cloud Manufacturing and have a question regarding how Oracle relates the … -
Manufacturing Time wrongSummary: Manufacturing Time Not Calculated Correctly When Resource Usage and Efficiency Are Modified in the Work Center Content (please ensure you mask any confidential … -
Getting "Unique Constraint violated" error upon uploading work definitions FBDISummary: The "Load Interface File for Import" process is erroring out, with the following error on one of the sub-processes (subprocess in Warning status): Rejected - Er… -
Audit feature for work instructions read by operator using smart operation workstationWe are doing some POC for manufacturing smart operation process flows with respect to that we need to identify if the work instructions are been read by user while compl… -
How to release the work order for partial qty, if the components are not available fully?Summary: We have a requirement of releasing the WO for partial quantity. Can we do this in oracle fusion? I also have few follow up questions: Can we release the WO if t… -
REST API / SOAP Service to create Production Exception on Work Order Operation levelNeed REST API / SOAP Service to create Production Exception in Quality Module on Work Order (MFG) - Operation level. We tried KB37699 with no luck. We are able to PE wit… -
need is to see the resource load on PS schedule even if no open work orders for that resourceSummary: We have defined 15 resource group and all those resource group contains resources, but 2 out of the 15-resource group are not appearing in the PS plan option. W… -
Maintenance work order status update from unreleased to released using ESSSummary: The Business wants to bypass the unreleased status when the maintenance work order is created either from a Work Request or from a manual creation, and that the… -
Work Definition subject area is not availableSummary: Hi, We are facing an issue with a user account since the environment upgrade from 25B to 25C. Both the user and I have identical access with all standard Manufa… -
How to do mass ATP check for the components before releasing the WOSummary: How to do mass ATP check for the components before releasing the WOs or Multiple WOs Content (please ensure you mask any confidential information): Version (inc… -
How to create approval cycle for manufacturing work order based on the statusSummary: Dears, We have a manufacturing module, but the quality is still not activated, for now we need to create an approval cycle for the work order status so when it … -
Process Work Order Resource transactions using Rest API & Visual builderSummary: Hello , "I'm encountering difficulties using the REST API via Visual Builder to bulk upload resource transactions for a Process Manufacturing Work Order. I've s… -
how to bulk complete a work orders in oracle fusionWe have a requirement to complete multiple work orders at the same time. is there any FBDI template or some other feature to achieve this requirement. Thanks, Srikar. -
When trying to import WC setup via CSV, we keep on getting an error.Summary: When trying to import WC setup via CSV, we keep on getting this error: The business object definition for XML node /WorkCenterVO/WorkCenterVORow from the XML fi… -
On what basis is the supply type is determined for a specific itemWhile providing an overview about the Supply Types(Push, Operation Pull, Assembly Pull) to the Business, on what basis or business case should we determine item supply t… -
Reporting actual resource time in the Smart OperationSummary: Customer wants to use Smart Operation and report resource transactions according to start-stop function. Is there a standard way to do that? Content (please ens… -
OSP Service Item attributes, Cost?Summary: I’m looking for guidance on the correct attribute setup for an Outside Processing (OSP) service item in Oracle Cloud. Specifically: Is an OSP service item consi… -
Modeling OSP Scenario with Customer-Supplied Components – Guidance NeededSummary: We are evaluating solution options for a client scenario involving Outside Processing (OSP). In this case, the finished good (FG) is assembled and shipped by th… -
in Redwood work definitions are duplicating on the listSummary: We noticed today that one item was listed 7 times on the Work Definition listing using Redwood. All the information is the same for each one. There is only 1 Wo… -
can you add expense items as a material on a work definitionSummary: Can you add expense items as a material on a work definition? Content (please ensure you mask any confidential information): Can you add expense items(non-inven… -
Changes in item not sync to work definitionSummary: Changes in supply type, supply subinventory and locator at item level doesn't propagate/ sync to work definition where these items are used as operation item. C… -
Scheduling cannot be done because work center resources are not assigned to shiftsSummary: We have all our resources assigned to 2 shifts in the work center (we have 2-shift workday pattern and all setups done as recommended) The resource is assigned …