To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Manufacturing
Manufacturing
Discussion List
-
Query behind Orderless Work Orders - Review Production Transaction HistorySummary: Hi, I tried looking for a REST/SOAP service to get the details similar to the UI - "Review Production transaction History (selected with Orderless)" Log on to F… -
Is there a way to set one number correlative across multiple Manufacturing plants?Summary: the customer would like to have diferent work order numbers but these must be continous accros three o more facilities ( Inventory Organizations as manufacturin… -
How to change work definition Name in the existing work definitionSummary: Would like to change work definition Name in the existing work definition, which has several alternate work definitions. Content (please ensure you mask any con… -
How do I report production in secondary UOM (unit of measure) via REST APISummary: We have a use case where we want to report production via REST API using only an item's configured, secondary UOM relying on the configured conversion factor to… -
API for work order components reservationSummary: Requirement is to reserve all components for a given work order. We will pass the work order as input to the API and it create reservations for all its componen… -
24C feature - Knowledge doc: CAPTURE DESCRIPTIVE FLEXFIELDS DURING MATERIAL TRANSACTIONSThe below steps are required to enable the DFF during the Material Transactions, Step-1 Navigate to Manage Descriptive Flexfields Step-2 Search with the Flexfield Code "… -
need to make work order scheduling to be maintained to match the following caseSummary: If we produce 1 quantity of Product X, which takes 1 labor unit and 3 hours of required usage, the lead time for this 1 quantity will be 3 hours. However, if we… -
Unable able to create Work Areas after upgrading to Redwood UISummary: Unable able to create or View Work Areas through the Redwood UI. Content (please ensure you mask any confidential information): Version (include the version you… -
Is there an API for reserving all work order components?Requirement: we would pass the work order number and the API should create reservations for all the components. -
How to automate material availability to release work order and generate pick slipSummary: Business needs to have automation on releasing the work order and generating the pick slip for the work order through an ESS job schedule. Condition 1 - System … -
What event triggers a change in the date of the work definition in the work order?Summary: A work order was created with a start date of 06/20/24 10:37 AM, however, the definition date has a future date “07/5/24 10:59 PM” (a date that we do not explai… -
Approval Worflow for Work Order and Work DefinitionThe business needs a approval workflow for work orders and definition work in Manufacturing. In the BPM there is the 'WorkOrderApproval', but we do not know if it is the… -
Is there any way I can retain my work order quantity even after scrapping few?Summary: Lets say we want to make 1000 qty, but in the process 100 were scrapped. Regardless, we want to produce 1000 as is the original requirement. Instead of readjust… -
Calculate Lead time and Roll up Cumulative lead time-Processing ErrorSummary: We are facing this issue when we run the "Calculate Lead time and Roll up Cumulative Lead time" Program. This is error - The lead time calculation was not perfo… -
Multiple Transform Work Definition of a product -Discrete ManufacturingWe have a requirement to have multiple transform work definition of a product A. System allowing to have feature of WD version but not allowing to change the "Transform … -
Pop up message when Review Dispatch listIs it possible via Sandbox/setup to pop up a Custom message or dialog box when the User clicks on the expand button (highlighted in screenshot below) in the Review Dispa… -
How to put Work Order on Hold automatically when an operation is completed?Summary: We have a requirement that a future operation in the Work Order which is not yet started be kept on hold. We need to understand how to achieve this. Is there a … -
How to restrict access to change Work Order status?Summary: We have a requirement that some users shouldnt have access to move the status of a Work Order from On Hold back to Released. It would be done by the supervisors… -
Correction of completed work order quantity in Process manufacurtingSummary: Correction of completed work order quantity in process manufacturing incase of wrong data entry or any product returns Content (please ensure you mask any confi… -
Process manufaturing support back to backOur customer follows process manufacturing process along with MTO (make to order) process. As per fusion functionality ( 24 B & 24 C) Back-to-back flow is currently supp… -
System does not pick the right operation based on the optional attribute valueSummary: W have setup transactional attributes for the basic CTO/ATO process to trigger creation of work order. Depending on the selection of a specific transactional at… -
Resources assigned to work DefinitionScreenshot attached below is from Resource assignment to Work Definition. Do we have any Oracle documentation link which mentions the functionality of each field here in… -
Process to convert the finished goods into an assetSummary: How can we create an asset from finished goods. Content (please ensure you mask any confidential information): Our client is into a manufacturing industry and m… -
Default complete Quantity to '0' in Review Dispatch listWork Order - Review Dispatch List is defaulting the remaining qty to complete. Is there any setup/customization to default the value as '0' and not the Qty to complete -
How can a user be authorized to visualize items without the authorization to modify anything?A user with the role "Product Manager" is authorized to read articles and automatically also authorized to modify them, and I would like to know if there are any possibi… -
Why Manage Work Definition Redwood User Experience not able to search filter work definitionsSummary: Why Manage Work Definition Redwood user experience UI does not display existing work definitions ? Not able to use search, filter or any functions on redwood us… -
Unable to search work order through Document number parameter in Manger Work Order UISummary: We are trying to search work orders reserved against document number, however, when a work order reserved to another work order we could not able to search thro… -
The REST API is failing to retrieve the lot details for a work orderSummary: Hi Team, We use this API to obtain the lot number: https://{pod}:443/fscmRestApi/resources/11.13.18.05/workOrders/{WO ID}/child/WorkOrderLotNumber. However, thi… -
How to setup 2 Suppliers for Outside Processing OperationHow to Setup 2 Suppliers on an Outside Processing Operation in Fusion? Let's say supplier A’s completed process and drop ships parts to Supplier B, but supplier B might … -
How to change production priority in work order based on reservationSummary: Consider, in manufacturing unit, work order will be prioritised based on the reservations. For eg, In a work order - reservation scenario, if Reservation flag -…