To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
create exception for reschedule in orderCan anyone help how to create the below exception: Need an exception created that shows us reschedule in suggestions have a projected on hand greater than the safety sto… -
Measure based filters not showing right combinationsSummary: Hi everyone, I’m encountering a persistent issue where a measure-based filter is not correctly restricting the data in my report. The measure based filter is fi… -
How to define Display Attribute in Supply PlanningSummary: Customer would like to have a DFF at work order header to be visible in supply plan allow user to enter a value for this attribute into planned order and pass t… -
Is there a way by which transfer order are created always in firm statusSummary: Currently, one of the subsidiary is using very limited oracle and manually creatign transfer order however it is not maintaining demand in the Oracle. In source… -
Difference between Late Supply Pegged to Forecast & Demand at Risk Due to Insufficient Lead TimeSummary: What is the exact difference between exceptions "Late Supply Pegged to Forecast" & "Demand at Risk Due to Insufficient Lead Time". Both are showing different nu… -
Relation between reservation lines and picks after pick releaseHello All, Is there any relationship between detailed reservation lines and the pick release process? For example, if I create a hard reservation first and then run pick… -
Any workaround to populate item revision into the Purchase Requisitions released from Planning?I found an idea already posted for this: ITEM REVISION DOES NOT DEFAULT ON A PR/PO RELEASED FROM PLANNING — Cloud Customer Connect It shows the status as Delivered. Howe… -
Can we update simulation set in supply plan using rest api?Summary: we have a requirement where we want to update simulation set before plan run using rest api, we tried using /fscmRestApi/resources/11.13.18.05/planOptions/{Plan… -
Transfer orders with a source of inventory and destination type of expense not recognised in supplySummary: Customer would like to see the transfer orders in Supply Plan where the Destination Type is Expense against to a Transfer Order. How can we achieve this. "Trans… -
How to configure changes in the views of Demand Management page layoutsSummary: I would like to know how to configure changes in the views of Demand Management page layouts and to know how to share them so that they are the default view for… -
Work orders inside an FTF is being elapsed to next day of the scheduleSummary: We have a Work order which was released on 16-Feb-2026 in Released-Firm status. This Work order was collected to PS in the latest run and we noticed that it was… -
Error while loading assignment set planningHi experts, I tried to load assignment set and sourcing rules through FBDI file for my supply planning in one zip file contains 2 separate files filled with assignment s… -
Constrained plan with weekly bucketsSummary: My customer is considering planning with weekly buckets because their planning horizon is long. I’d like to understand how the constrained plan with weekly buck… -
Unable to assign/view Permissions Group to standard/custom role. Enabled profile as wellSummary: Unable to assign/view Permissions Group to standard/custom role. Enabled profile as well Content (please ensure you mask any confidential information): Unable t… -
Supply Plan- Allow editing private plans but not public plansSummary: How can we create a user role (or whatever) that allows A user to copy a global-Public plan into a private plan and make as many changes as desired, But not be … -
How is forecast going to be calculated for an Item that belongs to 2 different Analisys Set?Let's say there is an ITEM-A that belongs to two Analisys Set, AS-1 and AS-2. Each Analisys Set has it's own forecasting profile with different methods (Lets say AS-1 wi… -
Old Receipt Deliveries (1 Year Old) Visible in Receipt Deliveries Page – How to Clear in Bulk?Description We are seeing receipt deliveries that are over 1 year old on the Receipt Deliveries page. However, the option in Manage Receiving Parameters to create receip… -
Process Manufacturing EBS to CLoud S&OP Planning PluginSummary: We are looking for guidance on establishing the connection/integration between Oracle EBS (Process Manufacturing) and Sales and Operations Planning (Oracle Clou… -
DFF Values Not Propagated to Transfer Orders After Supply Plan ReleaseWe are using attribute-based planning along with project details, and the following setups have been completed. DFF has been set up for Sales Orders, Work Orders, and Tr… -
Display the Last year Shipments History in Measure for 53 weeksSummary: Hi All, We need to show last year volume of Shipments History in measure. We create a measure similar to Shipments History 1 Year Ago. It is working fine at wee… -
Clarification on Planner Code functionality for planned orders released as WO from Supply Plan vs PRSummary: Hello we need some clarification on Planner Code functionality for planned orders released as Work Order to MFG from Supply Plan vs planned orders released as P… -
why system is not allowing to update firmstartdate on planned order using Rest API?Summary: System is not updating firmstartdate on planned order the even though rest API response is 200OK Content (please ensure you mask any confidential information): … -
When to Switch From Make‑to‑Order to Make‑to‑Stock strategySummary: Our client is facing lot of Order Orchestration issues as they unreserve the hard pegged supply to Sales order for B2B item and give it to other priority order.… -
Unable to Make the 'Plan options' work area as non editableSummary: We need to remove edit access for Plan Options from general users to prevent them from modifying the options. This access should only be available to specific u… -
Replenishment Planning Redwood Edit Plan Options page does not show check boxesSummary: Replenishment Planning Redwood Edit Plan Options page does not show check boxes for "Generate Forecast", "Calculate Policy Parameters", "Calculate Replenishment… -
Pegging not visible in replenishment planningSummary: I cannot see the Pegging symbol in Replenishment Planning (in both Classic and Redwood screens) Content (please ensure you mask any confidential information): I… -
Is Supersession Item Relationships feature available in Constrained Supply PlanningSummary: At Block, we have a requirement to plan for replacement item. We have a constrained supply plan and would like to use the item supersession feature. However, I … -
DM: Final Bookings Forecast measure value is not correct for some periodsSummary: DM: Final Bookings Forecast measure value is not correct for some periods Observations: In TEST, this issue is only happening to the periods that were updated i… -
How to get supply planning to plan discrete mfgSummary: We are using Supply planning to plan components of a large BOM of 160 components with a client who has a smaller operation but high value output for FG. We are … -
How to change the currency for a buy planned order in supply Planning?Summary: Need to understand if it is possible to change the currency for a Buy Planned Order generated by Supply Planning and how the currency is determined for the plan…