To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
Is Supersession Item Relationships feature available in Constrained Supply PlanningSummary: At Block, we have a requirement to plan for replacement item. We have a constrained supply plan and would like to use the item supersession feature. However, I … -
DM: Final Bookings Forecast measure value is not correct for some periodsSummary: DM: Final Bookings Forecast measure value is not correct for some periods Observations: In TEST, this issue is only happening to the periods that were updated i… -
How to get supply planning to plan discrete mfgSummary: We are using Supply planning to plan components of a large BOM of 160 components with a client who has a smaller operation but high value output for FG. We are … -
How to change the currency for a buy planned order in supply Planning?Summary: Need to understand if it is possible to change the currency for a Buy Planned Order generated by Supply Planning and how the currency is determined for the plan… -
Business requirement to convert PST time to UTC time in collaboration messagingwe have to use this in the messaging xslt -
ORA-00001: unique constraint (FUSION.MSC_KEYS_U2) violated in Load Entity program of Data CollectionSummary: We are running Data Collection program and getting error in one of the "Load Entity" program with Unique constraint violated. Please suggest what could be the p… -
consider sales order demand or min-max quantity only in replenishment planningSummary: is it possible to consider only sales order demand or Min-max quantity only for generating planned orders in a replenishment plan? In other words, Can we run a … -
Maintenance work orders in Released & Unreleased status are not getting collected into Supply PlanSummary: Maintenance work orders in Released and Unreleased status are not getting collected into Supply Planning Content (please ensure you mask any confidential inform… -
How can we make custom dffs visible in "Supplies and Demands" table?We have successfully deployed four Descriptive Flexfield (DFF) segments on the Supply Planning (MSC_SUPPLIES) entity. We require these fields (Lot Number, Locator, Case … -
How to Include Transfer Order Demand in Oracle Replenishment Planning's ADD Calculation?In the standard Oracle setup, the calculation for Average Daily Demand (ADD) relies primarily on Gross Forecast and excludes dependent demand types like Transfer Orders.… -
Will production schedule consider Non working days for Scheduling bucketSummary: Will The scheduling bucket in Production schedule include the Saturdays and Sundays part of the bucket. For instance, if the Scheduling bucket = 2, then how are… -
In Oracle Planning Cloud, is ATP available 24 x 7Summary: In Oracle PlanningCloud, is ATP available 24 x 7 ? During collectionrun and plan run there is no down time on ATP ? Content (please ensure you mask any confiden… -
Calulate a date using expressions/functions in planning measuresSummary: User would like to calculate an estimated stockout date. The formula to calculate the stockout date is = LastPlanUpdatedDate + Days of Cover onHand. The expecte… -
Measure Criteria in a table is not respecting when adding measure and showing incorrect resultsSummary: We have measure criteria defined with 2 measures in a pivot table. Measure A is greater than or equal to 1 and Measure B is not equals to 100 which is showing t… -
Production scheduling attribute sequencing logicSummary: For a scheduling bucket = 7, and the attribute sequence cycle as "Restart" how does the sequencing of work orders work based on the need by date for the below s… -
Due Date for Purchased Items Used in Manufacturing Operations by Manufacturing Start dateHi, All Summary: I would like to set the Due Date for purchased items which are used as components in manufacturing operations when released from Supply Planning, based … -
Limitations and Performance Impact of Project Assignments in a Supply Planning Project-GroupHi All, Summary: I would like to ask about the constraints for project-groups in Supply Planning. Content (please ensure you mask any confidential information): Is there… -
Manual demand not showing in material planHi we have constrained supply plan without forecast. I tried to create manual demand for some items and attached the demand to simulation set and then run the plan with … -
some issues with historical data that is driving high demand for specific monthsSummary: Hi All, we're seeing some issues with historical data that is driving demand for specific months with high values and also Booking Forecast is generated without… -
How to pull Custom Object value into Backlog Analysis tableSummary: We have defined a custom object to store the value for storing additional order line information. This custom object value is required to be pulled and displaye… -
Using Anchor date to Include SYSDATE to the Production scheduling HorizonSummary: In our PS solution we have the Anchor date and Time = 28-Nov-2025 12:00 AM and Horizon Extension= Rolling. While we Refresh our PS schedule, the inclusion of SY… -
Planned order aggregation based on Suggested due dateSummary: How does the Planned orders get aggregated based on the Suggested due date, given the Supply plan is in Daily buckets and the Item does not have a Fixed Days Su… -
Automatic triggering of "Import Supply Chain Data for Backlog Management" after CollectionSummary: Question Why is the ESS process "Import Supply Chain Data for Backlog Management" getting triggered automatically with every collections run, regardless of chan… -
How can I get access to Planning Central?How can I get access to Planning Central Work Area? Which role gives this access? -
How to restrict certain Issue transaction type in Consumption collection for Replenishment Planning?Summary: There is a requirement of excluding some Inventory Transaction Types (For example: Account Alias Issue) from collecting consumption for Replenishment Planning. … -
Automatic Min-Max planning based on consumption supply chain transaction dataSummary: Hello Team, We have Inventory management and oracle cloud supply planning in our scope. Currently, our client uses custom planning tool to calculate automatic m… -
Late work orders in Production scheduling varies based on anchor dateSummary: We have two schedules with different anchor dates provided, first one with 28-Nov-2025 and the other one is 02-Feb-2026. Both the schedules have their Horizon E… -
is there a way to release only safety stock plan order in supplies and demands?We have constrained supply planning without forecast and have safety stock for components and raw materials in particular orgs. Is there a way to release only safety sto… -
Planned order date schedule are after demand sales order in material planHi experts, I have constrained supply planning with 3 sales order demand for particular FG item. With the following scheduled ship date for 3 sales orders below. Why the… -
Days of Cover Safety Stock Planning method not considering demand in the current periodSummary: We are running Unconstrained Supply Plan with Days of Cover method. After the Plan run we are seeing that in the first daily bucket (Plan run date) the total de…