To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
unable to get a stable set of rows in the source tables for loading PlanningWe are trying to load measures data into planning using FBDI but while running 'Load Planning Data from Flat file' program i am getting below error. ORA-30926: unable to… -
How to assign lowest level in planning Hierarchy template FBDIHi, Our customer wants to have hierarchical planning. I'm considering DefineHierarchyImportTemplate FBDI and wondering how to assign the item as the lowest level? there … -
Enforce Resource Capacity Constraint - On hand pegging issueSummary: SCP Engine Constraint Mode with Enforce Resource capacity checked does not peg on-hand to work orders instead generates planned orders. Hi We are running a cons… -
DM: Can the system automatically approve the demand plan? Instead of users manually approving.Summary: DM: Can the system automatically approve the demand plan? Instead of users manually approving. UPDATE: Idea created. Please go to following link and vote for it… -
Pegged Quantity missing for Buy ItemsFor my make items, I’m able to view the pegged quantity in the Supplies and Demands section of my plan. However, when I check for my buy items (ingredients), I’m not abl… -
Is there any way to split planed order automatically based on order modifiers?Summary: Is there any way to split planed order automatically based on order modifiers? Content (please ensure you mask any confidential information): Currenty end user … -
Resource Requirements TableSummary: How is the 'Additional Capacity Required By Resource Constraint Date' Calculated in the Resource Constraint Table in Constrained Supply Planning? Content (pleas… -
Getting error EGO-2745476 while creating item using Visual Builder excel add-inSummary: I am using the Visual Builder excel add-in to create item using /fscmRestApi/resources/11.13.18.05/itemsV2, but getting the following error You don't have the r… -
User Defined Measure Unexpected BehaviorHi experts - hoping I can get some pointers on where to look to understand this behavior and fix the issue. We have a requirement to create a new measure called 'GVI DP_… -
How can we pull Work Order Header DFF into Supplies and Demand view in supply chain planningSummary: We have a requirement to pull Work Order DFF to Supplies and demand view as a new column in Supply chain planning. How can we map the data from MFG to SCP? Any … -
DM: What is the list of out-of-the-box Demand Management OTBI reports?Summary: DM: What is the list of out-of-the-box Demand Management OTBI reports? Content (please ensure you mask any confidential information): DM: What is the list of ou… -
How do we put lead time purchase item with different supplier for the same item ?We want to consider lead time for different supplier in our planning. I know the lead time for processing for both and make item are in PIM but how to have different pro… -
Is there set up in supply and demand planning when I have production capacityCode Snippet (add any code snippets that support your topic, if applicable): -
Does Unconstrained plan respect lead time processing and lead time supp for make item and buy item ?If I were to put processing lead time and lead time supplier for make and buy item in unconstrained supply plan would the plan still generate planned order without calcu… -
can we custom hierarchy and level planning for product in selector tool ?I want to make levels and hierarchy of my product in demand and supply planning. Example : School > Stationary>Eraser > Item. Those are my level of planning that the use… -
Safety Stock - Days of CoverSummary: I’ve configured the safety stock method using Days of Cover in the item import template, setting the planning method as Days of Cover for the assembly item (and… -
How to review the booking historySummary: Hi Team, I m trying to review the booking history but i m unable to see the collected booking history Could you please provide me the steps or navigation to rev… -
Can Demands/Supplies be accumulated at start of the month instead of endSummary: We are using Constrained plan. So, we can limit our time buckets for 150. Plan horizon is setup for 1 year out of which 60 in Day bucket and 10 in Month/Period … -
Does Production Scheduling Honor Lead times ?Summary: I see that for an Item, The Supply Constrained Plan is honoring the long lead time of a component item and suggesting planned order for the finished item 6 mont… -
How can we update the Pivot table Graph created by other user in demand and supply planning?Summary: How can we update the Pivot table Graph created by other user in demand and supply planning? Content (please ensure you mask any confidential information): Vers… -
How to consume forecast across OrgsSummary: We have forecasted at Demand Class, Customer, Customer site, org and item level using demand management. Forecasting bucket is monthly. We are feeding this to S… -
Release status for the purchase orders automatically appeared as "Cancelled"Summary: While uploading templates for supply planning, we also loaded the purchase orders template. However, when we ran the plan and checked the output, the release st… -
How to show item structures in supply planning tablesSummary: Hi, In supply planning predefined tables such as "Material Plan", the product hierarchy is only one level and final products and their components are displayed … -
EBStoSCP didn't collect all Intransit Shipments OrderType=11 in TransferOrder.csv for a specific OrgSummary: EBStoSCP didn't collect all Intransit Shipments OrderType=11 in TransferOrder.csv for a specific Org Content (please ensure you mask any confidential informatio… -
Why calendar is not getting collected in planning?We have assigned below calendar to one of our manufacturing orgs but it is not getting collected in planning. Collection mode: Ran target mode Error Text: You must provi… -
production scheduling tool could look at the BOM's of the jobsSummary: can production scheduling tool could look at the BOM's of the jobs to be able to determine certain criteria for change overrule setup? Content (please ensure yo… -
Attached Rate Based Forecasting and Planning for Non-CTO itemsSummary: We want to forecast and plan using attach rates for some of the options that are being sold with the main product. We don't want to use CTO because some of the … -
Work Order Does not show Demand PeggingWe have created a new plan for the purpose where no Planner Order should be generated by Supply Plan. This we have achieved by creating a simulation set and adding all t… -
Anchor Date in Production SchedulingSummary: Hello Team, May I know the purpose and best practice of using Anchor start date and time?. By reading Oracle documents it is understood that Anchor date is used… -
Targeted external forecast loadSummary: Hello, We have 2 different supply plans with 2 different sets of forecast designators. Both the plans have external forecast being loaded via FBDI and the desig…