To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
Oracle Cloud recommends to schedule out the existing Transfer, but new planned order to createdSummary: Oracle Cloud recommends to schedule out the existing Transfer Order. But in the same time it created a new Planned Order with an earlier date to be released Con… -
Safety stock quantity override value is not reflecting in safety stock measure.We are updating the value of safety stock quantity override measure at supply plan level. But we are not seeing any update on the Safety stock with the same value that w… -
Do we have Plug and Play Features between EBS and Oracle Cloud plannig systemSummary: One of my clients in the pharmaceutical industry using the EBS system plans to implement the Demand Management Cloud. I wanted to know if there is a plug-and-pl… -
Linking Categories to attributes in PIMSummary: In the PIM, can we link change in category to attribute, so any change in category leads to automatic update of attribute for Planning? Content (please ensure y… -
Dropship orders in Demand and Supply PlanningSummary: Dropship Sales orders Collection in Supply Planning Content (please ensure you mask any confidential information): We have a requirement to collect Dropship Sal… -
Planned order were not generated into Purchase RequisitionsSummary: Scheduled collection job set, and batch run plan were successful, but some planned order can't be converted into a PR. Additional inputs: Unconstrained planning… -
Is there a way to limit number of plan order for an item on a given daySummary: We use fixed order quantity, and sometimes planning would suggest creating 2 plan orders on a given day for the same item and it would cause storage violations … -
Difference of results with similar tables in the same Sourcing RulesHello, We have consulted a Sourcing Rules in two different tables: MSC_SOURCING_RULES and MSC_SR_RECEIPT_ORG. For the same Sourcing Rule, in the table MSC_SOURCING_RULES… -
Suggested Start date and Suggested dock date are differentSummary: We have a make item for which the total processing time is 0.08334 days. We manufacture in batches of 50480. Total time for a batch of 50480 units is around 2 (… -
Segmentation executed with no error but not showing any members in Plan inputs or in Plans.Summary: Segmentation executed with no error but not showing any members in Plan inputs or in Plans. Content (please ensure you mask any confidential information): Hi al… -
Safety Stock being loaded for item which has Safety Stock as Not planned at PIM levelSummary: Hi Team, We are doing Negative test case and found an issue. We changed the safety stock planning method from Safety Stock quantity to Not planned at item level… -
Trying to build a BIP report to get Archival data from Demand PlanSummary: I have a business requirement to compare the archival data between current quarter and last quarter. I am trying to build a BIP report using the MSC% tables. Co… -
Process Work Definition in Non Primary UOMSummary: Currently Client has Recipes in 'Kilogram' UoM in eBS OPM and we are migrating the Recipes into Work Definition in the same UoM of Kilogram. The Primary UoM of … -
Can we create custom tables similar to material plan based on suggested dock dates?Summary: We have a requirement to have tables similar to material plan based on Suggested dock dates. Material plan displays data based on Suggested due dates. Is it pos… -
Can we group requisitions based on combination of Supplier, Item and Requested delivery dateSummary: We have the requirement that the requisitions released from planning should be grouped by Supplier, Item and Requested delivery date. We are able to group the r… -
Production schedule should introduce delay between different Work Orders sharing same ResourceSummary: Our requirement is as below Assume All work orders take 3 hours to complete Work Order 1 and Work 2 are different work orders share same resource (Equipment) an… -
DM: Missing Forecasting Parameters MinForecastLevel, MaxForecastLevel, AggregateInactiveSummary: DM: Missing Forecasting Parameters MinForecastLevel, MaxForecastLevel, AggregateInactive Content (please ensure you mask any confidential information): DM: Miss… -
Can I Use the Mod Function in a Custom Measure Expression?Summary: I’d like to write an expression that returns a different value in leap years. Although the "Mod" function is not listed in the Edit Measure window, it seems to … -
Can we modify only one planned order qty through material plan ?Summary: Can we modify only one planned order qty through material plan if there are more than one planned orders on the same date. Content (please ensure you mask any c… -
DM: Engine is forecasting a combination that has one past period data point when toofew=2Summary: DM: Engine is forecasting a combination that only has one past period data point when toofew=2. Content (please ensure you mask any confidential information): D… -
Where to configure MSC_REST_CALL_UPDATE_MATRIX?Hi team, (Please help to migrate this post to a more suitable module's forum, thank you.) May I ask where to configure MSC_REST_CALL_UPDATE_MATRIX? I've tried with "Setu… -
Shipmethod with Transit time is getting calculated for Schedule Shipdate calculations-SCP cloudSummary: Hi All, Brief IT Background : Our Source instance is in EBS, Planning is in cloud environment (Supply planning cloud). We are running standard data extract prog… -
Issue with generating 'Consumption Forecast' in Replenishment PlanningSummary: We are following below steps for generating Consumption Forecast in replenishment planning but it is not working. Step 1: We are collecting consumption history … -
SP: Will an updated “Net Forecast” value be used by the engine in the next run?Summary: SP: Will an updated “Net Forecast” value be used by the engine in the next run? Content (please ensure you mask any confidential information): SP: Will an updat… -
DM: Show Shipment History without running a Shipments Forecast Profile.Summary: DM: Show Shipment History without running a Shipments Forecast Profile. Content (please ensure you mask any confidential information): DM: Show Shipment History… -
"A connection to the server has failed (status=504)"Summary: While opening any table in Demand planning we are getting error since 21st January : "A connection to the server has failed (status=504)" Content (please ensure… -
I want to change my item MRP Into MPS Without touching the item masterSummary:In Oracle Fusion Supply Planning, I want to change my item’s MRP (Material Requirements Planning) to MPS (Master Production Schedule) without modifying the item … -
Notifications not getting generated for custom exceptionsSummary: We have configured custom exceptions with notifications. Whenever custom exception generates, user should get a notification, but that is not happening. Content… -
we have opted for Release planned orders automatically. but we are getting blank work order numberHi, We have opted to release planned orders automatically, but we are receiving a blank work order number in the Planning Make Recommendation CSV file. Upon investigatio… -
Safety stock uploaded through FBDI is not showing up in Items tableSummary: Safety stock uploaded through FBDI is not showing up in Items table Content (please ensure you mask any confidential information): We uploaded Safety Stock thro…