Triggering of two different types Change Order Type using a single Item Batches
Content
We have business requirement where we want to trigger two different change order types simultaneously in a single Item Batches for updating an Item. We have created different Change order types. Currently we are using Different Product rules to trigger two different change order types.
So when we up[load a CSV file to a item batches the expectation is the system should trigger the change order base on product rule created and accordingly different change order get created base on the data present in the file.
However currently we are not able to trigger two different change order types in a single upload.
0