Loading and Retrieve Dates in Correct Format
Summary
Loading Dates formatted as mm/dd/yyyy type but they retrieve in scientific notationContent
The outline has the date type enabled.
The date fields that are loaded are tagged as date types.
Information loads correctly and I have confirmed the load file (.csv) has the dates formatted as mm/dd/yyyy.
When I go to retrieve (using the Dodeca Add-In), the dates retrieve in scientific notation (1.XXE+09) instead of mm/dd/yyyy.
Has anyone else encountered this problem and know a fix?
0