Hi guys

3rd question in relation with setting up VM templates for EBS. After long struggles I was finally able to start importing the VM template(s) to repositories. Right now I am importing the database template and the vm manager job status showing 1 job pending

My scenario is as following
Hardware, i7 proessor, 8GB

Oracle VM server running from VM Player (350GB partition for templates, 200GB for storage)
Oracle EL 6.2 running from VM Player, installed with Oracle VM Manager (3.1.1)
FTP server is running from Windows 7 64bit professional edition (Same hardware)

The total download is around 255 GBs for the database template and I am curious to know under normal conditions how long it takes for an import process to finalize the job.

Regards,

raj
  • 1. Re: Oracle EBS 12.1.3 Templates, Expected time to import templates
    470515 Newbie
    Currently Being Moderated
    :( Well, as I am monitoring the download process, it should complete in 8 hours time for downloading 250+5GB of template components (vm.cfg, System.img, ebs1211db.img(database)) (unless something really goes wrong)
    Setup, FTP server FileZilla(min transfer rate 9Mbs/s)
    Bridged network (VM Player 4)
    Oracle VM Server 3.1.1, Management Sever 3.1.1 (without latest patch)
    Both Servers configured with 4GB each

    Will update the status as it progresses