    E-Biz 12.1.3 High Availability on Linux

    956004
      Hi forum
      I have the following architecture (proposal)

      3 x Forms Server (serviced by an F5 for Load Balancing purposes)
      2 x Concurrent Manager Nodes (hopefully to have Paralllel Concurrent Processing)

      2 x database server (running active / passive databbase controlled by Oracle Clusterware (not RAC, just clusterware controlling automatic failover from Server1 --> Server2)

      My questions are:
      1) Does this arhitecture look OK (we are not quite ready to go to RAC, so clusterware is a more inexpensive option for HA)
      2) We are covered for failover at the forms server level with the F5 load balancer.
      3) I want to ensure we get failover for the Conc Nodes / PCP - how can I get CONC NODE 1 to failover to CONC NODE 2 upon failure and vicer versa

      Thanks
        • 1. Re: E-Biz 12.1.3 High Availability on Linux
          Hussein Sawwan-Oracle
          1) Does this arhitecture look OK (we are not quite ready to go to RAC, so clusterware is a more inexpensive option for HA)
          Yes.
          3) I want to ensure we get failover for the Conc Nodes / PCP - how can I get CONC NODE 1 to failover to CONC NODE 2 upon failure and vicer versa
          https://forums.oracle.com/forums/search.jspa?threadID=&q=PCP&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
          https://forums.oracle.com/forums/search.jspa?threadID=&q=PCP+AND+Failover&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001

          Thanks,
          Hussein