3 Replies Latest reply: Dec 6, 2012 12:10 PM by jstem1177 RSS

    SRW - Report gets re-submitted after 5 mins if not complete

      Hello All,

      I hope this is the correct forum to be posting this question. Currently, there is an application in the database which uses SRW package to submit jobs. I'm assuming this also uses the Advanced Queuing.

      In short, a report is submitted, and after exactly 5 minutes the report is is resubmitted. Though the first one is still running, this second one takes on the parent job id. The problem is that the report then gets send several times to destination (printer, email etc).

      I'm unable to determine where this is coming from. There is no dbms_job inside the database as far as I can see that is causing this.

      Is there a setting or something I may have overlooked with the SRW package?

      Thanks in advance for your assistance in this matter.

      Jan S.