    owb - Schedule based on event (e.g arrival of file) - possible?

      Hi Using


      We have several process flows which run on calendar (e.g 8 each day).

      Would like to schedule some process flows based on events (e.g arrival of a file, change in status of record in table (.eg form Y to N).

      Is this possible in OWB?

      If so How?