    Need R12 Upgrade plan

    990012

      Hi All,

       

      I need flow of 12.1.3 Upgrade.

       

      We are on 11.5.10.2 applications and database is on 11g(11.2.03).

      Now we are going to upgrade 11.5.10.2 to 12.1.3.

       

      Below is my plan First we need to upgrade from 11.5.10.2 to 12.1.1 then 12.1.3

       

      but my question is do we need to follow Interoperability Notes? or we can directly start 12.1.1 upgrade?

      Interoperability Notes Oracle EBS 11i with Oracle Database 11gR2 (11.2.0) [ID 881505.1]

        • 1. Re: Need R12 Upgrade plan
          Srini Chavali-Oracle

          Pl follow the steps in the Upgrade Guide - Oracle E-Business Suite Upgrade Guide

           

          HTH
          Srini

          • 2. Re: Need R12 Upgrade plan
            Hussein Sawwan-Oracle

            990012 wrote:

             

            Hi All,

             

            I need flow of 12.1.3 Upgrade.

             

            We are on 11.5.10.2 applications and database is on 11g(11.2.03).

            Now we are going to upgrade 11.5.10.2 to 12.1.3.

             

            Below is my plan First we need to upgrade from 11.5.10.2 to 12.1.1 then 12.1.3

             

            but my question is do we need to follow Interoperability Notes? or we can directly start 12.1.1 upgrade?

            Interoperability Notes Oracle EBS 11i with Oracle Database 11gR2 (11.2.0) [ID 881505.1]

             

            Please follow the steps under (Path E: Upgrade Path for Systems with 11.5.10.2 with a 11.1.0.6, 11.1.0.7, 11.2.0.1, 11.2.0.2, 11.2.0.3 Database ) section in (Database Preparation Guidelines for an E-Business Suite Release 12.1 Upgrade [ID 761570.1]).

             

            You need to apply additional database patches and modify initialization parameters as per the doc before upgrading to 12.1.1 then to 12.1.3

             

            Thanks,

            Hussein

            • 3. Re: Need R12 Upgrade plan
              990012

              Hi Hussein,

               

              I referred note id that is help full................ but

               

              We Already on 11.2.0.3 with 2 node Rac.

               

              Can i directly upgrade the applications from 11i to R12.1.1 with 2 node database ? (or)

              before upgrading do i need to disable the RAC configurantion? or can i continue with 2 node Rac?

              Could you please provide the Note id's for Upgrading 11i application with 11.2(Rac) database to R12.1.1

              • 4. Re: Need R12 Upgrade plan
                Hussein Sawwan-Oracle

                990012 wrote:

                 

                Hi Hussein,

                 

                I referred note id that is help full................ but

                 

                We Already on 11.2.0.3 with 2 node Rac.

                 

                Can i directly upgrade the applications from 11i to R12.1.1 with 2 node database ? (or)

                before upgrading do i need to disable the RAC configurantion? or can i continue with 2 node Rac?

                Could you please provide the Note id's for Upgrading 11i application with 11.2(Rac) database to R12.1.1

                 

                Please see this thread -- https://forums.oracle.com/thread/2549598

                 

                Thanks,

                Hussein

                • 5. Re: Need R12 Upgrade plan
                  990012

                  Hi,

                   

                  I am new to Rac, i have gone through the link could you please provide the steps

                   

                  1. As we Already we have 2 node RAC, How to disable/enable the RAC for existing environment?

                  2, After disabling can we run adpatch directly with out setting TWO_TASK for custom tns alias?

                  3.After R12 Upgrade is completion how can i configure previous existing Node?

                  • 6. Re: Need R12 Upgrade plan
                    Hussein Sawwan-Oracle

                    1. As we Already we have 2 node RAC, How to disable/enable the RAC for existing environment?

                     

                    Just shutdown all instances and keep one running.

                     

                    2, After disabling can we run adpatch directly with out setting TWO_TASK for custom tns alias?

                     

                    Again you are not disabling (or changing from RAC to non-RAC) and you only shutdown all RAC instances and keep one running.

                     

                    3.After R12 Upgrade is completion how can i configure previous existing Node?

                     

                    Using Oracle 11g Release 2 Real Application Clusters with Oracle E-Business Suite Release 12 [ID 823587.1]

                     

                    Thanks,

                    Hussein

                    • 7. Re: Need R12 Upgrade plan
                      1023618

                      Hi Hussein,

                       

                      You have Provided excellent information.

                       

                      I have Few More Queries

                      We are already on 11.2.0.3 Database with 11.5.10.2 applications

                      1. Do we need to follow the  Database Preparation Guidelines for an E-Business Suite Release 12.1 Upgrade [ID 761570.1]? OR Interoperability Notes Oracle EBS R12 with Oracle Database 11gR2 (11.2.0.2) [ID 1367644.1]?

                      • 8. Re: Need R12 Upgrade plan
                        Hussein Sawwan-Oracle

                        You need to follow the steps in [ID 761570.1] under "Path E".

                         

                        Thanks,

                        Hussein