4 Replies Latest reply: Aug 5, 2013 9:44 AM by E. Bill RSS

    failed to start a managed process Effective the maximum retry limit "EssbaseAgent"

    E. Bill

      Hello friends,

       

       

      I am trying to test the failover cluster configuration essbase on two machines.

       

       

      Both machines share the same ARBORPATH, the essbase server 1 comes to start without problem and I can connect with eas. But in the server2 when do I start passing the  "opmnctl  startall" I the following error message:

       

       

      startall opmnctl: starting opmn and all managed processes ...

      ================================================== ==============================

      opmn id = MASTER1: 6712

      Response: 0 of 1 processes started.

      ias-instance id = EPM_epmsystem1

      + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +

      ias-component/process-type/process-set: EssbaseCluster-1/EssbaseAgent/AGENT /Error

      -> Process (index = 0, uid = 0 pid = 0)

         Service fail over start failure

         log:

         none

      -> Process (index = 1, uid = 864555194, pid = 2016) failed to start a managed process Effective the maximum retry limit

         log:

        C: \ Oracle \ Middleware \ user_projects \ epmsystem1 \ diagnostics \ logs \ OPMN \ opmn \ consothe EssbaseCluster-1 ~ ~ ~ EssbaseAgent AGENT ~ 1.log

       

       

       

      In the logs I have this:

       

      --------13/08/02 12:20:58 Start process

      -------- "Fatal Error: Essbase Is Already loaded

      -------13/08/02 12:21:10 Start process

      -------- "Fatal Error: Essbase Is Already loaded

      --------13/08/02 12:21:12 Start process -------- "Fatal Error: Essbase Is Already loaded