Preventing Item On Hand reservation in a configure to order environment for multi org same OU environment

429bfaf9-7aa4-40ba-8a0d-0556826453e0 Newbie
Currently Being Moderated

I have a scenario in a configure to order environment where I want to automatically creating flow schedules based on sales order demand. I have two orgs in same OU.

1. How to setup sales order line to generate flow schedules in the manufacturing org and then ship the finished goods from the shipping org. I believe this can be done from sourcing rules to populate Warehouse field in sales order line with the shipping org and create Flow schedule in another manufacturing org. Please advise ?

2. Once flow schedule is completed I want to prevent the reservation of Finished good on hand against Sales order so that the On hand could be transferred to shipping org and shipped. Please advise ?

Thanks for your inputs.