    Migrating and converting a 11.2 non-CDB to 19C PDB

    greeny

      RDBMS Versions involved : 11.2.0.4 -------> 19.3.0.0

      OS: Source: Oracle Linux 6.8, Target: Oracle Linux 7.8

       

      I have production DB running on version 11.2.0.4 - DB Size: 8 TeraBytes, it consumes 80GB SGA and 20GB PGA.

       

      I just created a per-production CDB on version 19.3.0.0. Its a 2-node RAC.  This CDB will host 2 PDBs.

      I need to migrate the above mentioned 11.2.0.4 non-CDB to this CDB as a pluggable DB. Are the below mentioned steps by Mike Deitrich enough to accomplish this task ?

       

      https://mikedietrichde.com/2019/07/23/database-migration-from-non-cdb-to-pdb-upgrade-plug-in-convert/