<p>We currently use MS Project to create projects with a very granular set of tasks. A Some examples are the following - schedule meeting(4 days - 1 hour duration), have meeting (2 hours), install database (4 hours), setup document types (2 hours). A This is needed to get an accurate estimate on the project and give the consultants a detailed task list of what needs to be done. A However, recording time and managing the flow of the actual work during the project becomes next to impossible. A </p><p>An example would be that database setup requires 8 hours instead of 4. A So technically the PM would have to come in and move the time of that task out so that the timeframe of the project will now be accurate and forecasts will still be correct. A Trying to manage at that level of detail with a small staff has proven to be overwhelming and it simply doesn't get done. A Therefore we start to lose where we are in a project and our forecasts start to become unuseable as a larger project moves on. A At the same time we want our consultants to have a detailed list of what they need to do and indicate that they have done it. A But when they go to log their time I don't need it tracked by every granular task. A That becomes very difficult for the consultants. A They could simply track it against implementation or setup or client meetings as long as they could indicate what tasks or items they worked on. A </p><p>I am sure someone else has faced this type of situation. A My thoughts so far are below along with problems I have thought about.</p><p>1. A Have one project for the detailed estimate and another for time tracking with just high level tasks assigned to the consultants. A Problem is I still need to check off which tasks are done on the main project so the PM and the customer know where we are. A So either the consultants or the PM now have to manage two projects.A </p><p>2. A Use high level tasks and then put all the details in the issues list assigned to the high level task. A I like this because working from the issues list is easy. A Problem is that I don't think I can create project templates that will automatically create issues every time. A I can't lose the ability to create all the detailed tasks by using a project template.</p><p>A </p><p>Thanks for any suggestions in advance and have a great week.</p>