Why Work Orders Included in the Inventory Cost Revaluation
I have an issue with the Inventory Cost Revaluation. I created the ICR on June 18, 2026, with a transaction date of May 1, 2026, and included the cost components. However, in the Work Orders subtab, the system included Work Orders that were created before the ICR, going back as far as 2023. It included not only Work Orders…
-
Inventory Cost Revaluation - Inventory Location Configuration behaviour
Hi, I have 10 locations in the system and I am performing a revaluation for an Item for 1 or 2 locations — Netsuite creates an entry for the other locations (but Action is only Configure) Is this expected behaviour? We are only expecting the locations we revalue against the item listed here.
-
Planned standard cost record not generated
Hi There I have an assembly item whose standard cost I would like to revise. I have used the planned standard cost roll up page to select the item and the cost version applicable. This seems to run the process: However, no planned standard cost records are created. Why would that be the case? As seen in the screenshot, no…
-
How to resolve Planned Standard Cost Rollup error?
Hi All, When I do the Planned standard cost roll up for the group of items, its giving me the inactive error. But if I do the same thing with Standard cost for single item, its working. If anyone happen to face this error ,please do help me to fix this so that it helps for me to bill this month items. Any suggestions or…
-
How to reverse a Planned Standard Cost Rollup?
We had someone run a Planned Standard Cost Rollup but they applied it to the wrong date. How do we "reverse" the mistake?
-
How to resolve Planned Standard Cost Rollup error?
Hi All, When I do the Planned standard cost roll up for the group of items, its giving me the inactive error. But if I do the same thing with Standard cost for single item, its working. If anyone happen to face this error ,please do help me to fix this so that it helps for me to bill this month items. Any suggestions or…
-
Planned Standard Cost Rollup/Revalue Standard Cost Inventory - Simpler Method?
Currently when needing to do a Planned Standard Cost Rollup and then a Revalue Standard Cost Inventory it requires scrolling through multiple pages to select the item(s). There could be as many as 70-80 pages to look through. Is there an easier way to accomplish these tasks without having to scroll through multiple pages?
-
Am I using the wrong import type and record type for Standard Cost Import?
I can't seem to complete the item default standard cost rollup then revaluation due to failing to import the standard cost field. We have multi-location configuration enabled and I have verified items are set to standard costing method. My question: Am I using the wrong import type and record type for his import? I cannot…
-
Faster Revalue Standard Cost Inventory Process
We're in the midst of an implementation and currently loading items into our Sandbox environment. Throughout testing, we're running Standard Cost rollups and revaluations. We have around 3,000 assembly items manufactured in 2 locations. Our Revalue Standard Cost Inventory process takes a few hours currently. We have more…
-
No External ID Inventory Cost Revaluation
Hi Guru's, I'm testing an import for a Inventory Cost Revaluation after a Manual Change in the Planned Standard Cost. I Noticed that the Internal ID of the Planned Standard Cost is the External ID of the Inventory Cost Revaluation. Export Planned Standard Cost: Export Inventory Cost Revaluation: I would expect that the…