Getting quarters with two input date-parameters
748467Jan 22 2010 — edited Feb 8 2010I have to find a way to get all the quarters between a startdate and an enddate, like 01-04-2009 (startdate) and 31-11-2009 (enddate). An extra condition is to count an extra quarter above the enddate, so the last quarter is 2010-01 (first quarter of 2010).
The desired result will be:
2009-02
2009-03
2009-04
2010-01
The start- and enddate are inputparameters.
How do I get this result?