    WBS Structure

    958254
      Good arvo,
      I was wondering if there was a way how to link the line items to a macro activity, same as the Work Breakdown Structure. I am trying to expand macro activities totalled by the sum of their related line items or sub-activities, e.g., Activity 1 - Masonry; Activity 1.1. Bricks; 1.2. Sand, and so on.
      Is there a routine where I can do it?