WBS Structure

958254 Newbie
Currently Being Moderated
Good arvo,
I was wondering if there was a way how to link the line items to a macro activity, same as the Work Breakdown Structure. I am trying to expand macro activities totalled by the sum of their related line items or sub-activities, e.g., Activity 1 - Masonry; Activity 1.1. Bricks; 1.2. Sand, and so on.
Is there a routine where I can do it?