2 Replies Latest reply: Jan 7, 2013 8:51 AM by Veeresh.S RSS

    Quick Switch over  and failover

    Richa
      Hi,
      I'm totally new in oracle.
      Our client has oracle dataguard already configured from my colleague but that person has already left our company.
      Now client is asking to test switchover of all dataguard (03 in numbers) configured by that earlier person.
      Please if there is some video or any good point to point document for this.
      I'll really appreciate if I can get something in video format.

      (1) Oracle9i (9.2.0.1.0)
      (2) Oracle 10g (10.2.0.3.0)
      (3) Oracle 11g (11.1.0.7.0) with application on EBS 12.1.3 done with doc Business Continuity for Oracle E-Business Release 12 Using Oracle 11g Physical Standby Database [ID 1070033.1]

      Thanks.
        • 1. Re: Quick Switch over  and failover
          CKPT
          Richa wrote:
          Hi,
          I'm totally new in oracle.
          Our client has oracle dataguard already configured from my colleague but that person has already left our company.
          Now client is asking to test switchover of all dataguard (03 in numbers) configured by that earlier person.
          Please if there is some video or any good point to point document for this.
          I'll really appreciate if I can get something in video format.

          (1) Oracle9i (9.2.0.1.0)
          (2) Oracle 10g (10.2.0.3.0)
          (3) Oracle 11g (11.1.0.7.0) with application on EBS 12.1.3 done with doc Business Continuity for Oracle E-Business Release 12 Using Oracle 11g Physical Standby Database [ID 1070033.1]

          Thanks.
          You can check the below link for video on Switchover and Failover from Mahir, It is very detailed.
          Switchover --> http://www.mahir-quluzade.com/2011/11/overview-switchover-on-oracle-data.html
          Failover --> http://www.mahir-quluzade.com/2011/11/overview-failover-on-oracle-data-guard.html
          • 2. Re: Quick Switch over  and failover
            Veeresh.S
            This below links might help you.....

            Switch Over[11g] : http://shivanandarao.wordpress.com/2012/04/23/switchover-of-physical-standby-database/
            Fail Over[11g] : http://shivanandarao.wordpress.com/2012/08/28/dataguard-failover/
            Switch Over[10g] : 10.2 Data Guard Physical Standby Switchover [ID 751600.1]