    Why is the FROM field in Task Details not always populated on in-flight BPs

    Marc DiNick
      On a BP, the Task Details section contains a "From:" and a "To:" field.

      1. If I am the assignee, the From and To fields are populated.
      2. If I am NOT the assignee, the From field is empty, but the To field is populated. The behavior is the same whether the assignee accepted the task or not.

      This becomes inconvenient, for example, on a coordination step with multiple inflows and outflows. If the From field were always populated, I could readily get a sense of the context of the current step without fishing through the timestamps of the Process Details, particularly if this step is revisited multiple times.

      Granted, it's minor, but our users have noticed. Is there any reason for this?