3 Replies Latest reply on May 15, 2013 6:31 AM by Veeresh Rayan

    DAC scheduler Tab: Next Trigger option

    1008784
      Hi All,

      I am facing a problem with DAC scheduler option. My DAC server was down and by the time I bought it up, one of the executive plan's time has been crossed.

      For Ex: If my executive plan "Run_Daily" is supposed to run at 5/14/2013 12:04AM, the bought the DAC server back up at 5/14/2013 12:45AM.

      So, I did change the next trigger value of that "Execution Plan" to 5/14/2013 12:50AM such that it can get triggered at 5/14/2013 12:50. But unfortunately the job is not being triggered, but the "Next Trigger" value is being changed to next day 5/15/2013 12:04AM. Did anyone face the same issue? If so, how can it get corrected?

      Thanks in Advance