Skip to Main Content

Database Software

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

Moving Total Calculated Measure in a cube

valeksandrovaApr 30 2014 — edited May 9 2014

Hello!

We've been using AWM for our cubes, but we have performance issues so we decided to give it a try with OWB. We have many calculated measures that sum over a period of time. But the problem with OWB is that when we select in the dialog Time Frame -> Moving Total (or any other moving..) on the next page it shows nothing, no options, just a blank dialog with the buttons "next", "back", etc.. And if I finish the selection with the dialog with nothing it doesn't update the expression it opens the dialog to create calculate measure again.

http://i.imgur.com/abhgAFL.png?1?6386

http://i.imgur.com/nAxCZUj.png?1

http://i.imgur.com/XlytoNU.png?1

Could reinstall of the client fix it or is it a problem on the server where OWB is installed?

Edit: Our OWB client version is 11.2.0.4

Best Regards,

Veselina

Comments

Processing
Locked Post
New comments cannot be posted to this locked post.

Post Details

Locked on Jun 6 2014
Added on Apr 30 2014
1 comment
948 views