5 Replies Latest reply on Sep 26, 2014 6:43 AM by Michele Vecchiato

    Hardware requirements (Optimal) for Enterprise Controller with Co-Located Proxy & Remote Proxy Controller

    2631790

      Need some clarity on Ops Center Hardware requirements for Provisioning multiple clients over a network.

       

      Hardware requirements for:

      a) Enterprise Controller with Co-Located Proxy

      b) Remote Proxy Controller

       

      Need optimal hardware requirement (like CPU, Memory (Physical/Swap), Disk Space) for the above mentioned a) & b) to provision/cater maximum number of clients at time.

       

      Hardware requirement for Enterprise Controller with Co-Located Proxy &  Remote Proxy Controller per Server (for provisioning)?

      Lets say if I need to provision 10 servers at a time what is the optimal Hardware requirement for Enterprise Controller with Co-Located Proxy &  Remote Proxy Controller.

      or if I need to provision 100 servers at a time then what is the optimal h/w requirement.

       

      In details of storage requirement,

      At some point, they have mentioned that all controllers require Cache Size of 74 GB. Can you help us in understanding what is this Cache and where it resides.

      Looking for your input.