    12.2.4 upgrade and rapidwiz

    MSK

      We are currently on 12.1.2 ebiz and using shared appl_top  and 11.2.0.4 database (2 node rac).

      Plan is to upgrade to 12.2.4

      Question is

      1. Do I need to run rapidwiz on node 1 of database node and again on node 2 as well ? Eventhough I specified that I have a 2 node rac, it looks like rapidwiz only configured node 1 and node 2 does not have any information (like conf.txt or new context file). Autoconfig was also run on node 1 only.

      2. When I configure the apps tiers, I dont have the option of adding multiple nodes. So, even if you have a shared appl top, do you still have to run rapidwiz on hte primary node then patch it and then use the add node procedure to add the second node?

       

      Thanks


      Kumar