0 Replies Latest reply on Nov 16, 2015 9:04 PM by user10881200

    12c Multi Project in Parallel MUDE+RPD+BAR question

    user10881200

      Hi All,

      I'd been scurrying through documentations and Rmoff had a very useful (as always ) topic on the "basics" on RPD juggling on 12c..  (Re: Oracle BI 12c. Repository)

       

      What i fail to grasp is how to do a "partial" migration?

      In Bold what i'm not 100% sure yet, like how BAR will be utilized here?

       

      Let's assume: Mude is up, etc.

      • I have projects 1->5 start RPD in parallel
      • Projects 6->10 are already onboard they work on RPD (fixes mainly, but some of them major stuff) and catalog

       

      Development starts, project 2, project 4 require deployment to online and project 7 goes to UAT.

      • P2,P4:
        • They generate a patch?
      • P7:
        • We generate a BAR? (without user and connections)
        • Or RPD patch + Catalog Archive movement?
      • Based on the patches we download UAT and merge, then do a BAR merge?

       

      Can someone do some clean up for me on a scenario that is a bit more complex then in the documentation?

      (Ps.: yes, i read the MUDE guide and the Eden Project example, but it's very fuzzy now)

       

      Thanks a lot in advance,

      Cheers

      D