0 Replies Latest reply on Feb 10, 2016 9:44 AM by Osman Topcu

    Is it possible to enter Required Test Results on JDE Quality Module step by step / on different time..?

    Osman Topcu

      Hi everyone,

       

      I have an issue about quality test results entry at a pharmaceutical manufacturing company during the JD Edwards implementation process. The company should keep the tests on ERP system as a required test, but they want to enter the results of these tests step by step. Because there are many responsible product quality departmants that will enter the results on different time and separately. According to my experience and searches until now, if the user saves the tests as a required, all test resullts should be entered at the same time then it can be saved on P3711 Test Results Entry screen. Is it possible to implement their process with JD Edwards, is there any different test results entry screen that can allow this kind of processes ?


      Thanks for your interest..