    Week over week

    3193829

      Hi,

       

      I have to calculate week over week date. The user can choose a date from the Date prompt on dashboard and based on it, i should calculate a week before date and do some calculations.

      I am using the formula wow date = (todays date - 7 days).

      However, my customer was pointing out that when she selects this monday, the previous monday date should be given. I think my formula works the same way. I am just wondering if i am missing something as my client was pointing out so much of how it should be calculated.

      am i missing to capture something here ?

       

      Thanks & Regards,