4 Replies Latest reply on Dec 18, 2017 11:22 AM by Moatasem Shebl

    EPM Automate Script

    Moatasem Shebl

      Hello Leaders,

       

      Can you help me with the below point,

       

      I have a batch file which i used it to run a data load rule using EPM automate utility and i scheduled that batch file, what i need is to use the current or server time in place of the data load rule start and end period i mean i need that batch file to take the system or server period so the data load rule period in that batch file will be a parameter take his value from system time

       

       

      I want that period to be a variable take its  value from system or server date (sysdate) which mean no manually edit will be done with that date in the batch file

       

      Thank you