1 Reply Latest reply on Jul 25, 2019 10:13 PM by user3715462

    High level of NLS Upgrade to12.2.8

    user3715462

      Hi All,

      we are using EBS 12.1.3 and DB 12c and want to upgrade to EBS 12.2.8 (1US and 4 NLS)

      the upgrade is fine.  just not clear about NLS upgrade.

       

      Please advise a high level flow of NLS upgrade to 12.2.8

      Here is what i intend to do

      1- Upgrade EBS 12.1.3 to 12.2.0

      2- Upgrade EBS 12.2.0 to 12.2.8

      3- Install 4 NLS patches (4 Language patches 12.2.8)  using ADOP to EBS 12.2.8

      4- request translation Synchronization patches (4 NLS) and apply using ADOP to 12.2.8

       

      I did not apply the base 12.2.0 for 4 NLS. is it okay?

      Please let me know if anything's wrong with this approach.

      Thanks in advance.

      Regards,

       

        • 1. Re: High level of NLS Upgrade to12.2.8
          user3715462

          After doing more research on this subject, I think there are 2 methods of doing it.

          1. upgrade from 12.1.3 to 12.2.0 (US) to 12.2.8(US) then use (Doc ID: 252422.1). Requesting Translation Synchronization Patches to request a translation synchronization patch for each language.

           

          2. upgrade from 12.1.3 to 12.2.0 (US), applying all (12.2.0) NLS patches here then upgrade to 12.2.8 then again applying all (12.2.8) NLS patches here

          but because this is an upgrade so we need to use Doc ID: 252422.1 to request a translation synchronization patch for each language again.

           

          The difference between these 2 methods is file size. for method 1, it will be very large and method 2 is small.

          I'll use method 1 for my upgrade.

          Please advise.

          Thanks.