    ODI:asynchronous mode vs load plan

    3988035

      I heard that There are two ways to accomplish parallel
      executions in ODI:

      Call ODI scenarios in asynchronous mode (using an ODI procedure or ODI
      run scenario from tool box) or create parallel steps in Load Plans and assign
      any number of ODI scenarios under each parallel step.

       

      Is it possible to implement both ways or it does not make sense to go with load plan if achieved through asynchronous mode or vice versa?

       