I've always been able to edit the Repeat Interval of a Scheduler Job by clicking on the pencil icon to the right of the single line description. Could still do it in 19.2, but cannot in 19.4, where nothing happens. Is this a bug or is there a Preference or something I'm missing?
Thanks.
Jack