    WIP Mass Load - Update BOMs and Routings on Unreleased Jobs

    720518
      I would like to be able to refresh the BOMs and Routings that are used by Discrete Jobs that are currently in status Unreleased. I would like to do this before I run MRP to ensure that any jobs marked as released during planning process have the most update to date BOM and Routing attached.

      I have tried to use the WIP Mass Load to do this by updating the Bom Revision Date and Routing Revision Date. Although this works in the Forms, when this Revision Date is updated via the WIP Mass Load,the BOM and Routing information remains the same.

      do I need to do something to trigger the change to BOMs and Routings on this Jobs via WIP Mass Load?

      I would appreciate any help on this subject.

      Thanks

      Barbara