Hi guru
we are wanting to do the following and stuck probably the limits on creating Assembly
Rice Bags as follows:
Rawmaterial Uom cost
Rice Bag Brand A Each 800
Rice Bag BRand B Each 900
Assembly
Rice Pack Brand A KG
Rice Pack Brand B KG
Packing charges (Outsourced Cost) Each bag of Rawmaterial = 100
BOM Revision
Assembly=Rice Pack Brand A
Primary Unit type = Weight
Primary Stock Unit = KG (could be any one of 2kg 5kg or 25kg)
Primary Sale Unit = KG
Primary Base Unit = KG
Components:
- Rice Bag Brand A
- Packing charges
During manufacturing the outsourced manufacturer repack the
RM= Rice Bag Brand A