Scheduling Reports in OBIEE based on dynamic dates
Summary
Schedule report delivery on dynamic date parameter.Content
Is it possible to schedule a report in OBIEE based on a dynamic date parameter via prompts built into the report? I don't want to build several reports to schedule based on the dynamic date. Instead I'd like to have one report that can be scheduled based on a month ago or 7 days ago if necessary.
0