Essbase Allocation Advice
Summary
Essbase Allocation AdviceContent
Hello All,
I'm attempting to write an allocation calc that retains its 'source' information after being allocated out. My thought is to use a second set of dimensions for two purposes:
1. Take in the alloc % for target intersections
2. To receive the $
This is my desired result (note the header line = column names):
I'm struggling with the calc though, since I'm not sure how to bring multiple dimensions into the calculation and multiply across all possible combinations. I'm also not sure how to create a relationship where src_b = b.
Any advice? Is there a better way to go about this?
0