How to handle Cost Allocation requirement handled in EBS through an Extension?
Summary
How to handle Cost Allocation requirement handled in EBS through an Extension?Content
Hi everyone,
We have a requirement to do cost allocation currently done in EBS through an extension because the standard
functionality cannot accomplish it and we realize that it is not possible in Cloud too.
The requirement is as follows:
All indirect costs are charged to an indirect project (eg I1000) throughout the month (period).
The cost to be allocated is derived by summing the PTD Payroll costs from eligible source projects and multiplying it by 10%.
The eligible source projects (for calculation) in this case are All projects with 3 different Project Types Project Types A, B and C.
Tagged:
0