Definition of Lead Time Percentage in the Work Definition OperationContent
There's a field in the work definition operation called Lead Time with a percentage symbol. See image below. I found this in Doc ID 2666338.1 on My Oracle Support Knowledge:
The lead time percent value is calculated and updated for each operation in the primary work definition. The lead time percent represents the offset of a given operation as a percentage of the manufacturing lead time considering all operations of the work definition. These lead time percent values are used as an input in the calculation of cumulative lead times to compute the cumulative manufacturing lead time and cumulative total lead time.