Hi All,
I have a customer with a situation that would like to manage their items in the average method. Customer have also assemblies as subassemblies or finish goods (top assembly). Can someone share how I can achieve updated assemblies cost considering that the components are being updated constantly by the average method? What will be the steps to make sure that the cost will be accurate for the assemblies all the way up?
Many thanks,
Alon.