Which is the mapping between memo lines and free form projects in PPM-RMCS integration
Summary:
I try to set up the linkage between a free form project and the SSP profiles linked to the memo lines in RM, but I don't know which is the connection between specific memo line values and the free form projects.
I tried to upload 2 contracts linked to 2 projects and observed that one of them went on the standard Fix Price Memo Line and the second one went to the standard Time and Material Memo Line.
Content (required):
The two differences between my two contracts and their associated projects were:
The free form contract line which was transferred into RM in the "fixed price memo line" had the bill plan "amount based", while the second one which went into RM in the "time and material memo line" had the bill plan "bill rate".