Writing Back to Budgetary Control from EPM
Hello Experts,
Is there a way to write back data from EPM to Budgetary control cube (Currency code setup as STAT). I tried multiple times to write back but no luck with STAT currency and ended up with the below message.
Error message: None of the data in your budget import group matches a control budget. Check your data.
I do have the required security roles and data set access assigned.
Any suggestions or Tips to make this work
Regards,
Raja
Tagged:
0