Our Client has a requirement to have asset lines allocated based on Cost Center Segment .
Summary:
In Our Project, Fixed Asset Team wants to create multiple Assets in projects module and want to have asset lines based on Cost Center segment from Accounting of a Cost Transaction.
Currently when we run generate asset lines, based on asset assignment we get asset lines. Incase multiple assets are assigned to same task, un allocated asset lines are generated.
Content (required):
Step :1 : Created a Capital Project and there is a single task in the project
Step :2 : Created two Assets and assigned the same task for both Assets.
2.a : For Each Asset, Asset Location is different.
Location and Cost Center segment both are 1-1.