Variable lead time at item level is not considered by Constraint Supply Plan for Make item

Summary: Oracle Fusion Supply Planning

  • Demand is due to external forecast, so Demand due date = date of demand from external forecast ( forecast loaded via FBDI, Forecast designator) - date is 26-Feb-2024
  • Order Qty = 10
  • Variable lead time set at item level = 1
  • post processing lead time = 2
  • No other lead times are set for the Make item
  • Total lead time ( pre + ASL + post ) that is required for the component raw material(Buy) is 6

I believe ideally , Suggested dock date = Suggested start date + lead time, where lead time = ( Fixed lead time + ( Qty * Variable lead time ))

It's showing correctly when the plan is unconstrained but once we change it to constrained it's showing same date for Suggested start date, Suggested ship date and Suggested dock date. This is only for Make item. Why it's not considering the lead time while calculating Suggested dock date?