Usage of Drill through
Hi There,
We have enabled the Drill through option in FCCS and loaded the data through data integration(Current period).
We are unable to drill through for the previous periods.
Is there a way to achieve this as we want to do the drill in the previous periods as well?
Best Regards
Sashidhar Reddy
0